Project Overview
Client
Siam Auto Parts Manufacturing
Location
Rayong, Thailand
Scale
1.2MW PV + 500kWh Storage
Date
2024-07
Challenge
An automotive parts factory in Thailand's Eastern Economic Corridor needed to cut electricity costs and ensure uninterrupted power for precision manufacturing equipment.
Our Solution
We installed 600W TOPCon modules on the factory rooftop, paired with 100kW hybrid inverters and a 500kWh liquid-cooled storage system. The setup delivers both peak shaving and clean energy.
Supplied Products
PV Modules 600WHybrid Inverter 100kWC&I Liquid-Cooled Storage 500 kWh
Key Results
40%
Reduce Energy Costs
800 tons/year
CO₂ Reduction
4.5 years
Payback Period